Replacing a roof that already has solar panels

A reroof under solar is two jobs that have to be timed together. Here is what removal and reinstall involve, what they cost, how to sequence the roofer, and how to avoid paying for it twice.

By Truman Rountree, Solar and Storage Guides Editor. Updated .

Questions about your own roof? We answer 24/7

Solar guideRenewing Energy
Solar crew removing panels from a Washington, DC roof before a reroof
Topic
Roof work
Reading time
3 minutes
Written by
Truman Rountree
Short answer

Replacing a roof that has solar means removing the panels and racking first, storing them, letting the roofer work, then reinstalling and testing the system. Fixr puts removal and reinstall at about $200 to $300 per panel, or $2,800 to $4,800 for a typical system, before the roof itself.

Crew lifting solar panels off an old roof before a replacement

Why the panels have to come off

Roofers cannot replace shingles or a membrane under an array, and the panels are live electrical equipment. They have to be shut down, disconnected, removed with their racking and stored before the roof work starts.

Reinstalling is just as important: new attachments must be flashed into the new roof, the wiring reconnected to the original design, and every string tested before the system goes back online.

What removal and reinstall cost

Fixr puts solar panel removal and reinstallation at about $200 to $300 per panel, or $2,800 to $4,800 for a typical system, not counting the roof. Roof Maxx puts the combined cost of a roof replacement with solar removal and reinstall at roughly $10,300 to $28,662, depending on the roof and the array.

The per-panel price depends on access, storage, whether new mounting hardware is needed and how far the crew has to travel.

Sources: fixr.com, roofmaxx.com

Solar technician checking wiring under a raised panel on a DC roof

How to sequence the roofer and the solar crew

The cleanest schedule puts removal, roofing and reinstall in tight sequence, with dates agreed between the roofer and the solar crew before anyone starts. The roof should not sit with capped penetrations longer than necessary, and the system makes nothing while the panels are off.

If the roofer finds deck damage, the schedule slips; build in a little margin and keep both crews in touch.

  • Agree removal and reinstall dates with the roofer
  • Confirm where the panels will be stored
  • Plan new attachments for the new roofing material
  • Test every string after reinstall
Electrician installing a home battery in a Washington, DC basement

Roofer already scheduled? Call and we will plan the panels around it.

Call (771) 247-9849

Flat rowhouse roofs are different

On a flat rowhouse roof, the array often sits on ballasted racks behind the parapet, and the membrane under it is what wears out. City Renewables notes the membrane condition is the key concern on these roofs.

Ballasted sections can sometimes be moved in stages so the roofer can work around them, which may cost less than a full removal. Attached racks need their flashed bases removed and reinstalled with the new membrane.

Sources: cityrenewables.com

Use the removal to fix other things

With the panels off, it is the cheapest moment to replace aging panels or an inverter, add panels, plan a battery, or install bird mesh. Doing those jobs later means paying for access twice.

Ask the solar crew to note any damaged panels, chewed wiring or failing connectors during removal, with photos, so you can decide before reinstall.

Questions to ask both contractors

Before the work starts, get the roofer and the solar crew talking. A few questions settle most of the problems that show up on reroof jobs.

  • Who shuts down and removes the system, and who reinstalls it?
  • Where are the panels stored, and how are connectors protected?
  • What attachment and flashing will the new roof take?
  • Who is responsible if a leak shows up at a solar mount later?
  • When is the reinstall date, and what happens if the roof runs late?

Avoid the reroof altogether if you can

The best time to replace a roof under solar is before the solar goes on. If you are planning solar and your roof has only a few years left, replace the roof first.

Angi puts typical solar repairs at $120 to $550 for a cracked panel and $100 to $400 for wiring, so catching damage during removal can save a second visit later.

Sources: angi.com

Reroofing under solar questions

Day or night

Plan the panels around your new roof

Tell us when the roofer is scheduled. We will set removal and reinstall dates around it.

Line open 24/7(771) 247-9849

Phone, hours and offices

Phone
(771) 247-9849
Hours
Answered 24 hours a day, 7 days a week
Service office
1013 15th St NW, Washington, DC 20005
Head office
3184 Atrium Way, Mount Laurel Township, NJ 08054
Coverage
Washington, DC, with nearby Maryland and Northern Virginia. See the coverage overview
Call 24/7 (771) 247-9849